Gasboy PC TopKAT Upgrade Procedure Instrukcja Użytkownika Strona 3

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 6
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 2
MDE-4308 PC/TopKAT Upgrade Procedure May 2004 Page 3
Upgrading from PC/TopKAT Version 2 or 3 to Version 4
Shut Down Interbase Server
The Interbase Server must be shut down or stopped prior to PC/TopKAT installation or
uninstallation.
For Windows 95, Windows 98, or Windows ME
®
1 Right click on the Interbase Server icon in the lower right corner of the Windows Taskbar tray.
2 Select Shutdown.
For Windows 2000
1 Log onto your PC as the Administrator.
2 Click the Start button.
3 Click Settings.
4 Click Control Panel.
5 Click Administrative Tools.
6 Double click on the Services icon in Control Panel.
7 Select Interbase Server from the list.
8 Click the Stop button.
9 Follow the on-screen instructions.
For Windows NT
®
1 Log onto your PC as the Administrator.
2 Click the Start button.
3 Click Settings.
4 Click Control Panel.
5 Double click on the Services icon in Control Panel.
6 Select Interbase Server from the list.
7 Click the Stop button.
8 Follow the on-screen instructions.
Przeglądanie stron 2
1 2 3 4 5 6

Komentarze do niniejszej Instrukcji

Brak uwag